We – EPG Group the largest gearbox & motors , couplings and gears manufacturing facility in China with 5 different branches. For more specifics: Cell/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778083988828
Software:
>> Created for the pool pump, bathtub pump, centrifugal pump
>> Be manufactured of seleceted quality substance, most recent design in entirety
>> Great overall performance, lower sound, tiny vibration, safe and trustworthy coopeation
>> Nice appreance, gentle bodyweight
>> Be preserved extremely convenienty, basic constuction.
Operating Circumstances:
one. Ambient temperature: -15 degree Celsius≤ θ ≤ 40degree Celsius
two. Altitude: ≤ 1000m
three. Rated voltage: 220V
4. Rated frequency: 50Hz/60Hz
5. Responsibility: Steady(S1)
six. Insulation class: Class B/F
7. Security course: IP44/IP54/IP55
eight. Cooling method: IC0141
Notice: If you have any specific requirements, you should get in touch with us.
Model | Output | Current | Energy | Eff | Pace | Tstart/Tn | Ist/In | Tmax/Tn | |
KW | HP | (A) | Element | (%) | (r/min) | ||||
FT63-a hundred and eighty | .eighteen | one/four | one.33 | .93 | sixty six | 2800 | .five | four | 1.eight |
FT63-250 | .twenty five | 1/3 | 1.82 | .ninety three | sixty seven | 2800 | .5 | 4 | one.8 |
FT63-370 | .37 | one/2 | 2.sixty two | .93 | 69 | 2800 | .45 | four | one.8 |
FT63-550 | .fifty five | 3/4 | three.79 | .ninety three | 71 | 2800 | .forty five | four | one.8 |
FT71-550 | .fifty five | three/four | three.79 | .ninety three | seventy one | 2800 | .45 | four | 1.8 |
FT71-750 | .seventy five | one | five.02 | .93 | seventy three | 2800 | .four | four | 1.eight |
SD63-one hundred eighty | .18 | 1/four | 2.sixty two/1.31 | .93 | 67 | 3450 | .5 | 4 | 1.eight |
SD63-250 | .25 | 1/3 | 3.6/1.eight | .93 | 68 | 3450 | .five | 4 | 1.eight |
SD63-370 | .37 | one/2 | five.sixteen/2.fifty eight | .ninety three | 70 | 3450 | .forty five | 4 | 1.eight |
SD63-550 | .55 | three/four | 7.forty six/3.seventy three | .ninety three | seventy two | 3450 | .forty five | four | 1.8 |
SD71-550 | .fifty five | three/4 | seven.sixty six/3.83 | .ninety three | seventy two | 3450 | .45 | 4 | 1.8 |
SD71-750 | .75 | 1 | 9.9/4.ninety five | .93 | 74 | 3450 | .four | 4 | 1.eight |
SD80-1100 | 1.one | one.5 | fourteen.14/7.07 | .ninety three | 76 | 3450 | .4 | four | 1.eight |
SD80-1500 | one.five | 2 | 19.04/9.52 | .93 | seventy seven | 3450 | .35 | five | 1.8 |
SPARE Areas:
PAC ept Ways
FAQ
Q: Do you provide OEM service?
A: Yes
Q: What is your payment expression?
A: 30% T/T in progress, 70% balance when receiving B/L copy. Or irrevocable L/C.
Q: What is your guide time?
A: About 30 days after obtaining deposit or unique L/C.
Q: What certifiicates do you have?
A: We have CE, ISO. And we can use
The use of authentic equipment manufacturer’s (OEM) element figures or emblems , e.g. CASE® and John Deere® are for reference needs only and for indicating merchandise use and compatibility. Our business and the outlined alternative areas contained herein are not sponsored, accepted, or made by the OEM.